Battery lines simulated against sudden production changes
Find out how the lines would respond to sudden changes in the production programme, stoppages included.
- Client
- Confidential client
- Sector
- Sector: Automotive
- Division
- Division: CYP SIRE
01
Context
At a battery plant, the question was whether the lines could absorb the production changes requested from one day to the next, some of them very sudden.
02
Challenge
- Production programme changes from one day to the next
03
What we did
We simulated the lines numerically with a Python model: it takes the production inputs, includes stoppages and returns the line's response at each iteration.
-
Numerical line model
Production inputs, stoppages and results, iteration by iteration.
A similar project? Let’s talk.
You hear back from the team that does that work: CYP ENGY, CYP DATA or CYP SIRE.